-
v0.6.0 Stable
released this
2026-07-27 17:45:52 +02:00 | 9 commits to main since this release- Overtime days now draw down the week's required hours, with the reduced total tinted purple in the "This week" capsule.
- Overtime days can cover a full day, the first half, or the second half — pick from the week rail's context menu. The chosen half is marked on the day timeline and drawn as a striped purple run on the day bar.
- Hours worked past the day's requirement are marked with a green striped run, replacing the old solid-red band at a fixed 8 h. The threshold is now the day's actual required hours.
- The week's worked total turns green once it passes the week's requirement.
Downloads
-
Source code (ZIP)
0 downloads
-
Source code (TAR.GZ)
0 downloads